Home News

company news about Chemical injections to assure and condition flow by preventing build-ups

Certification
China Suzhou Meilong Tube Co., Ltd. certification
I'm Online Chat Now
Company News
Chemical injections to assure and condition flow by preventing build-ups

Chemical injections to assure and condition flow by preventing build-ups

 

In order to prevent deposition typically inhibitors are injected. Depositions or build-ups in the oil and gas processes usually are asphaltenes, paraffins, scaling and hydrates. Of those asphaltenes are the heaviest molecules in crude oil. When they adhere, a pipeline can quickly plug. Paraffins precipitate out of a waxy crude oil. Scaling may be caused by the mixing of incompatible waters or by changes in flow like temperature, pressure or shear. Common oilfield scales are strontium sulfate, barium sulfate, calcium sulfate and calcium carbonate. To avoid those build-up inhibitors are injected. For preventing freezing glycol is added.

 

If we want to condition the flow we have to

• prevent emulsions: they cause enormous production delays in separators

• avoid frictions like with asphaltenes

• reduce viscosity as oil is typically a Newtonian fluid

Pub Time : 2023-08-22 17:04:20 >> News list
Contact Details
Suzhou Meilong Tube Co., Ltd.

Contact Person: Mr. John Chen

Tel: +8618551138787

Fax: 86-512-67253682

Send your inquiry directly to us (0 / 3000)